SILIKA — The High-Purity Quartz Standard

WHITE PAPER · SEPTEMBER 2026 · V2.0

SILIKA · SILICA MINING RESOURCES

The High-Purity
Quartz Standard

A reserve-backed digital asset anchored to the Mareeba High-Purity Quartz Project — an estimated 11.2 Mt reserve in Far North Queensland, Australia, secured by a 500,000 tpa off-take and placed on compliance-grade trust infrastructure by Bubix Group.

11.2 Mt

Estimated reserve

7

Granted mining leases

500,000 tpa

Secured off-take

~20 yrs

Mine life

99.99%+

Ultra-HPQ potential

US$200M+

Annual revenue (base)

SILIKA · BEP-20 · BSC11.2 Mt ESTIMATED RESERVE500,000 TPA SECURED OFF-TAKE7 GRANTED MINING LEASESFAR NORTH QUEENSLAND · AUSTRALIABUBIX GROUP TRUST INFRASTRUCTURE99.99%+ ULTRA-HPQ POTENTIALUS$200M+ ANNUAL REVENUE BASE CASESILIKA · BEP-20 · BSC11.2 Mt ESTIMATED RESERVE500,000 TPA SECURED OFF-TAKE7 GRANTED MINING LEASESFAR NORTH QUEENSLAND · AUSTRALIABUBIX GROUP TRUST INFRASTRUCTURE99.99%+ ULTRA-HPQ POTENTIALUS$200M+ ANNUAL REVENUE BASE CASE

IMPORTANT NOTICE

00

Basis of preparation — read this first

This document has been prepared for discussion with prospective strategic investors and partners. It is a summary only and does not constitute an offer, invitation, or recommendation to subscribe for securities, nor investment, legal, or tax advice. The project is at an estimated, pre-feasibility stage.

01

Independent verification

Tenure can be verified against Queensland Government records (Queensland Globe; permit EPSL00627313). The project is at an estimated, pre-feasibility stage; reserve figures are company estimates and are not JORC-compliant Mineral Reserves.

02

Assay-led de-risking

The development pathway is designed to replace every estimated figure with measured data — channel sampling, whole-rock geochemistry, and beneficiation testwork — before material capital is committed.

03

Staged exposure

The funding ask is phased so that each tranche purchases a defined de-risking milestone. Forward-looking statements involve known and unknown risks; actual results may differ materially.

01 — EXECUTIVE SUMMARY

A 20-year supply position in the world's most concentrated strategic mineral

As demand for high-purity quartz accelerates with AI compute, semiconductor fabrication and solar glass, global supply remains concentrated in a single US district. SILIKA addresses this gap by providing tokenized access to the Mareeba High-Purity Quartz Project — an estimated 11.2 Mt reserve anchored by a secured 500,000 tpa off-take in Far North Queensland, Australia.

US$200M+

ANNUAL REVENUE — BASE CASE AT 100% HPQ

US$357.5M

ANNUAL REVENUE — PREMIUM MIX (85% HPQ / 15% ULTRA)

~61%

EBITDA MARGIN AT DECK PRICE ASSUMPTIONS

The Asset

Seven granted mining leases over granite-hosted quartz ridges, blows and vein networks in an established mining district — 60–90 minutes by road from the Port of Cairns.

The Token

SILIKA (BEP-20) converts verified reserve and production data into a transparent, asset-backed instrument — value flows through buyback, revenue sharing and staking.

The Trust Layer

Bubix Group — builder of national blockchain infrastructure with 140+ core patents — places SILIKA on a compliance-native digital trust stack engineered for real-world assets.

INVESTMENT THESIS — THREE CONVERGING FORCES

~40–42%

AI & Semiconductor

Of HPQ demand comes from semiconductors; the industry is expanding at over 19% p.a.

29.5% CAGR

Solar Glass Demand

Solar PV is the fastest-growing demand flank — solar glass demand growing at 29.5% CAGR through the build-out horizon.

$27.77B → $43B+

Global Silica Market

The global silica market projected to exceed $43B by 2032 — SILIKA opens it to tokenized participation.

Far North Queensland — Mareeba region

LOCATION

Far North Queensland

Mareeba · 60–90 min to Port of Cairns

02 — THE ASSET

Mareeba Nordev Quartz Silica

Nordev Quartz Silica Pty Ltd · Far North Queensland, Australia

Seven granted mining leases over granite-hosted quartz ridges, blows and vein networks in an established mining district. Mareeba is an advanced developer, not an exploration story — quartz bodies are visible at surface across multiple leases, with alluvial accumulations available as low-cost starter feed. Every position is verifiable through Queensland Government tenure records.

GEOLOGICAL PROFILE

Host rock
Granite-hosted quartz ridges, blows and vein networks
Starter feed
Alluvial accumulations — low-cost, surface-available
Purity potential
99.3–99.7% SiO₂ HPQ; 99.99%+ Ultra-HPQ via thermal chlorination
Surface expression
Quartz bodies visible at surface across multiple leases
District
Established mining district, Mareeba, Far North Queensland
Road access
60–90 minutes to Port of Cairns by sealed road
High-purity quartz crystal formation
QUARTZ CRYSTAL FORMATION · MAREEBA
Mining site Far North Queensland
MINING SITE · FAR NORTH QUEENSLAND

GRANTED MINING LEASES — 7 LEASES · 33.98 ha TOTAL

LEASE
AREA
TYPE
ML 20354
4.86 ha
Hard-rock ridge
ML 20357
5.12 ha
Hard-rock ridge
ML 20360
4.94 ha
Quartz blow
ML 20361
5.01 ha
Vein network
ML 20362
4.78 ha
Alluvial + vein
ML 20363
4.63 ha
Quartz blow
ML 20364
4.64 ha
Alluvial accumulation

ESTIMATED RESERVE

11.2 Mt

Company estimate across 7 granted leases. Pre-feasibility stage — assay-led de-risking underway.

SECURED OFF-TAKE

500,000 tpa

Volume anchor for the full production ramp — HPQ and Ultra-HPQ to Asian semiconductor and solar buyers.

MINE LIFE

~20 years

11.2 Mt ÷ 500 ktpa ≈ 22 years of arithmetic supply at full off-take.

TENURE

EPSL00627313

Verifiable through Queensland Government records (Queensland Globe). Granted, not applied for.

03 — THE MARKET

A structural supply deficit in the mineral that powers computation

High-purity quartz is a ~US$1.1B market growing at 4–8% p.a. — and silicon sits on Australia's Critical Minerals List. Yet global supply of crucible-grade feed remains concentrated in one US district, leaving Asian buyers actively seeking new sources. Hurricane Helene's 2024 disruption of Spruce Pine accelerated that search.

AI data centre infrastructure

42%

OF HPQ DEMAND

Semiconductor & AI

Crucible-grade HPQ is irreplaceable in semiconductor manufacturing. AI compute expansion is driving chip fab investment at record pace — TSMC, Samsung and Intel are all expanding capacity.

Solar panel farm

29%

OF HPQ DEMAND

Solar PV Glass

Solar glass is the fastest-growing demand flank at 29.5% CAGR. Every gigawatt of solar capacity requires high-purity silica glass — and the energy transition is accelerating globally.

Semiconductor fabrication

18%

OF HPQ DEMAND

Optical & Specialty

Optical fibre, UV-transmitting lenses, laboratory ware and specialty glass all require high-purity silica. Demand is growing with telecommunications and precision manufacturing.

WHY HIGH-PURITY SUPPLY STAYS CONSTRAINED

  • Only ~5% of silica deposits globally meet ≥99.5% purity requirements
  • Global supply of crucible-grade HPQ concentrated in a single US district (Spruce Pine, NC)
  • Hurricane Helene (2024) disrupted Spruce Pine — Asian buyers accelerating source diversification
  • Limited high-grade processing capabilities outside the US
  • Rising demand from AI, semiconductor and solar industries outpacing new supply
  • Environmental and regulatory constraints on new mine approvals
  • Silicon sits on Australia's Critical Minerals List — strategic priority for government support

~US$1.1B

Global HPQ market

Growing 4–8% p.a.

40–42%

Of HPQ demand

From semiconductors

29.5% CAGR

Solar glass demand

Fastest-growing flank

1 district

Global supply concentration

Spruce Pine, North Carolina

$27.77B → $43B+

Global silica market

2025 → 2032 projection

~5%

Of deposits qualify

For ≥99.5% purity requirements

04 — THE PURITY LADDER

Value is a function of purity — Mareeba sits at the summit

The price differential between quartz products is substantial and directly linked to purity and processing. Where ordinary silica sand trades by the truckload, crucible-grade Ultra-HPQ trades by the kilogram. Mareeba's beneficiation and thermal chlorination pathway targets the two highest tiers of the ladder.

TIER
PURITY
PRICE
USE

T1

85–95% SiO₂

Low

Mass market

T2

90–98% SiO₂

Medium

Manufacturing

T3

≥98% SiO₂

US$40–60/t

Industrial glass

T4

≥99% SiO₂

US$200+/t

Renewable energy

T5 · MAREEBA HPQ

99.3–99.7% SiO₂

US$400/t FOB

Semiconductor crucibles

T6 · MAREEBA Ultra-HPQ

99.99%+ SiO₂

US$2,500/t FOB

Advanced technology

05 — FINANCIAL FRAMEWORK

Revenue & EBITDA at the 500,000 tpa off-take

Illustrative arithmetic at deck price assumptions, ~30% tax proxy. Not a valuation opinion or forecast. LOM = Life of Mine.

PARAMETERBASE — 100% HPQPREMIUM — 85% HPQ / 15% ULTRA
Annual production500,000 tpa500,000 tpa
HPQ volume500,000 t @ US$400/t FOB425,000 t @ US$400/t FOB
Ultra-HPQ volume75,000 t @ US$2,500/t FOB
Annual revenueUS$200.0MUS$357.5M
EBITDA (~61% margin)~US$122M~US$218M
Net profit (~30% tax proxy)~US$85M~US$153M
LOM feed11.2 Mt11.2 Mt
Mine life~20 years~20 years
LOM revenue (base)~US$4.0B~US$7.15B

ANNUAL FINANCIALS (US$M) — SCROLL TO ANIMATE

$200M

Base Revenue

$122M

Base EBITDA

$85M

Base Net Profit

$357.5M

Premium Revenue

$218M

Premium EBITDA

$153M

Premium Net Profit

BASE CASE
PREMIUM MIX

LOM REVENUE — BASE

~US$4.0B

20 years × US$200M p.a.

LOM REVENUE — PREMIUM

~US$7.15B

20 years × US$357.5M p.a.

EBITDA MARGIN

~61%

At deck price assumptions

06 — THE 20-YEAR MINE PLAN

Three phases — build, ramp, sustain

Capital is staged so each tranche purchases a defined de-risking milestone. No material capital commits before measured data replaces estimated figures.

PHASE I

YR 1–2

PHASE II

YR 3–10

PHASE III

YR 11–20+

Phase I

Years 1–2

Plant Build & Commissioning

  • Modular crushing, flotation and acid-leaching facilities near Mareeba, sized to the 500 ktpa off-take ramp
  • Trial mining across granted leases provides feed for commissioning and assays
  • Bulk qualified samples to Asian semiconductor and solar PV crucible manufacturers underpin the secured off-take
  • Staged capital deployment matched to the production ramp
  • SILIKA token launch and Geological Oracle (DRTR) first attestation

OUTPUT

Commissioning complete; token liquidity established; on-chain reserve data live.

CAPEX PROFILE

Staged — tranche-matched to milestones

Mineral processing plant construction

Phase II

Years 3–10

Ramp to Full Off-Take

  • Open-pit selective extraction across primary hard-rock ridges (ML 20354, ML 20357, ML 20360)
  • 500,000 tpa total output — HPQ (99.3–99.7% SiO₂) @ US$400/t FOB
  • Ultra-HPQ (99.99%+) @ US$2,500/t FOB via thermal chlorination line
  • Containerised export via the Port of Cairns, 60–90 minutes by road
  • Proof of Production (IoT · GPS · satellite) on every tonne — on-chain

OUTPUT

US$200M–US$357.5M annual revenue band at deck prices; verified on-chain production.

CAPEX PROFILE

Full production ramp — revenue self-funding from Year 3

Open pit quartz mining operation

Phase III

Years 11–20+

Sustained Delivery

  • Steady 500,000 tpa delivery under the off-take agreement
  • Reserve extension and throughput upside beyond the current 11.2 Mt estimate
  • Deepen hard-rock mines through reserve life
  • A stable, non-US alternative supplier to Asian tech supply chains for two decades
  • DAO governance and token ecosystem at full maturity

OUTPUT

Token value mechanically linked to production performance.

CAPEX PROFILE

Sustaining capital only — reserve extension drilling

Port of Cairns container terminal
Supply chain logistics

07 — SUPPLY CHAIN

Mine to market — four steps,
every tonne on-chain

Quartz extraction site
01

Extraction

Mareeba, FNQ

Open-pit selective extraction across 7 granted mining leases. Alluvial accumulations provide low-cost starter feed; hard-rock ridges deliver the primary reserve.

Mineral processing plant
02

Processing

On-site plant, Mareeba

Modular crushing, flotation and acid-leaching to HPQ (99.3–99.7% SiO₂). Thermal chlorination line for Ultra-HPQ (99.99%+). Every tonne verified by IoT weighbridge sensors.

Port of Cairns container terminal
03

Export

Port of Cairns · 60–90 min

Containerised export via the Port of Cairns. Supply Chain NFT Passport issued on every shipment — origin, purity and movement data recorded on-chain for full traceability.

Semiconductor fabrication facility
04

Delivery

Asian semiconductor & solar buyers

Secured 500,000 tpa off-take to Asian semiconductor crucible manufacturers and solar PV glass producers. A non-US source for a supply chain that cannot afford disruption.

ON-CHAIN VERIFICATION AT EVERY STEP

Physical production, programmatically attested

IoT weighbridge sensors, GPS tracking and satellite verification create a multi-layer production record. Each verified output triggers on-chain production events — reserve updates, revenue tracking and value distribution — without manual intervention.

IoT Weighbridge

Every tonne measured at source

GPS Tracking

Movement from pit to port

Satellite Verification

Independent cross-check

NFT Passport

On-chain shipment identity

08 — FUNDING ASK & CAPITAL STRUCTURE

Staged exposure — each tranche buys a defined milestone

The funding structure is designed so that no material capital commits before the preceding de-risking milestone is achieved. Investors at each stage purchase a specific outcome, not a promise.

Tranche 1

Seed / Pre-Sale

De-Risking

Channel sampling, whole-rock geochemistry, beneficiation testwork — replace every estimated figure with measured data

MILESTONE

Assay results published; JORC-pathway scoping complete

Tranche 2

Private Sale

Plant Build

Modular crushing, flotation and acid-leaching plant construction near Mareeba; trial-mining feed for commissioning

MILESTONE

Plant commissioned; first qualified HPQ samples to off-take counterparty

Tranche 3

Public Sale

Production Ramp

Ramp to 500,000 tpa; thermal chlorination line for Ultra-HPQ; full off-take delivery

MILESTONE

Full off-take volume achieved; US$200M+ annual revenue run-rate

TOKEN SALE STRUCTURE — 15% OF TOTAL SUPPLY (375,000,000 SILIKA)

ROUNDALLOCATIONTOKENSPRICEVESTING
Seed2.5%62,500,000TBA12-month cliff, 24-month linear
Private Sale7.5%187,500,000TBA6-month cliff, 18-month linear
Public Sale5%125,000,000TBAPartial TGE unlock, 12-month linear

USE OF PROCEEDS

Project Development & Operations30%

Mining, processing plant, operational scaling

Reserve / Treasury20%

Stability buffer and long-term sustainability

Liquidity (DEX/CEX)10%

Market stability and trading depth

Ecosystem & Partnerships10%

Industrial partners and B2B expansion

Marketing & Community5%

Awareness and growth

INVESTOR PROTECTIONS

Staged capital — no material deployment before milestone verification
Assay-led de-risking before plant construction begins
On-chain reserve attestation (DRTR) — quarterly, decentralized oracle
Proof of Production on every tonne — IoT, GPS, satellite multi-layer
DAO governance — token holders vote on treasury and buyback decisions
Queensland tenure verifiable through public government records

07 — TOKENOMICS

Fixed supply, controlled distribution, long-term alignment

Fixed supply with no additional token minting. Controlled release ensures market stability. Buyback mechanisms reduce supply and support long-term value.

TOKEN SPECIFICATION

Token NameSILICA Mining Resources
SymbolSILIKA
NetworkBinance Smart Chain
StandardBEP-20
Contract Address0x7212111067A4C5B56D064c6dE85eB16266D416f1
Total / Max Supply2,500,000,000 SILIKA
Decimals8
Token TypeStandard BEP-20

ALLOCATION — 2,500,000,000 SILIKA

Project Development & Operations30%
Reserve / Treasury20%
Public & Private Sale15%
Liquidity (DEX/CEX)10%
Ecosystem & Partnerships10%
Team & Founders7%
Marketing & Community5%
Advisors3%

08 — TOKEN UTILITY & VALUE ACCRUAL

Real-world production, programmatically returned to holders

SILIKA connects real-world production with blockchain to build a transparent, scalable ecosystem. Value is captured and redistributed through revenue and token incentives, aligning enterprise performance with token growth.

Buyback & Burn

A portion of revenue is used for token buyback and burn, reducing supply and supporting long-term value.

Revenue Sharing

A share of operational profits is distributed to token holders, linking real-world performance to token value.

Staking Rewards

Token holders earn rewards through staking, supporting long-term participation and ecosystem stability.

Operational Value

Token value is directly tied to mining and production performance across the quartz value chain.

DeFi Utility

Tokens can be used in DeFi for liquidity, lending, and yield generation, improving capital efficiency.

Ecosystem Participation

The token enables access to governance, staking tiers, and broader ecosystem participation.

09 — THE TRUST LAYER

Powered by Bubix Group · Digital Trust & Intelligence Infrastructure

SILIKA integrates physical reserves, operational data, and blockchain into a unified RWA ecosystem, where each layer continuously validates the others — from geological verification to production and token distribution — ensuring transparency, reliability, and system-wide integrity.

01

Physical Asset Layer

The Mareeba quartz reserve provides real-world backing and intrinsic value.

02

Data & Validation Layer

Geological and production data are continuously verified for accuracy and reliability.

03

Blockchain & Tokenization Layer

Validated data is recorded on-chain and converted into tokens and NFTs for transparency and accessibility.

04

Value & DeFi Layer

Value flows through revenue and DeFi mechanisms, linking production to financial outcomes.

Geological Oracle (DRTR)

Converts physical reserve data into verifiable on-chain information, updated quarterly. Field surveys, laboratory testing and standardized reserve modelling are submitted through a decentralized oracle, while the Dynamic Reserve-to-Token Ratio continuously recalculates reserve backing against circulating supply.

Quarterly verificationCross-verified dataDecentralized oracleOn-chain DRTR updates

Proof of Production (PoP)

Mining activity is recorded on-chain using IoT sensors, GPS and satellite data, validated through multiple independent layers. Each verified output triggers on-chain production events for revenue tracking, reserve updates and value distribution.

IoT weighbridge sensorsGPS trackingSatellite verificationMulti-layer validation

Commodity-Linked NFT (CL-NFT)

Verified quartz reserves represented as tiered digital assets on-chain. Each NFT carries reserve metadata — volume, purity, location — linking physical assets to programmable digital value usable as staking collateral.

Reserve representationVerified metadataTier structureStaking & collateral utility

Supply Chain NFT Passport

A verifiable digital identity for every shipment, from extraction to final buyer. Origin, quality and movement data recorded on-chain enable full traceability, compliance and premium market pricing.

End-to-end trackingVerified data passportOn-chain transparencyPremium market access

Carbon Credit Integration

Production emissions are continuously measured, offset through verified programs, and recorded on-chain — embedding ESG alignment and auditability into the production system.

Emission measurementOffset mechanismOn-chain trackingESG alignment

Reserve-Backed Lending (RBL)

A dual-collateral model combining token value with underlying quartz reserves. Loans carry stronger security, reduced risk exposure and more stable access to liquidity within the ecosystem.

Dual collateralReduced lending riskRisk control safeguardsStable liquidity

10 — WHY BUBIX

The dual DNA of crypto innovation and enterprise standards

SILIKA is placed on-chain by Bubix Group — a full-stack blockchain infrastructure company whose technology has powered national-scale networks. Bubix bridges crypto-native innovation with enterprise-grade standards: 100% self-developed IP, battle-tested in production environments across finance, trade and government.

NATION-SCALE TRACK RECORD

Xinghuo BIF

China's national blockchain infrastructure — build & operation experience

Zetrix Ecosystem

Cross-border trade & finance platform — ZTrade, ZCert, ZIdentity, ZEFi, NFTPangolin, Zetrix Wallet

SERVICE MODEL — BUILD & OPERATION

Most vendors hand over the code and leave. Bubix stays — mainnet deployment, node networks, wallets, block explorers and smart-contract tooling, plus joint operations, developer-community building and token strategy. Build + Operations = sustainable growth.

100%

Self-developed

Full IP ownership, complete in-house tech stack

140+

Core patents

Key innovations at the industry forefront

120+

Clients

Across industries

70+

Large enterprises

Major players in production

10+

Fortune 500

Global leaders

FULL STACK, 100% SELF-DEVELOPED

Underlying BlockchainSmart ContractsPrivacy ComputingDecentralized Identity (DID)Trusted DataSpaceAugmented AIAsset Tokenization (RWA)Industrial Digital FinanceTrusted Trade FacilitationCross-Border SettlementDAO GovernanceDeFi Services

11 — GOVERNANCE, LEGAL & COMPLIANCE

Structured legitimacy at both ends of the asset

DAO Governance

Token holders propose and vote on ecosystem decisions — treasury deployment, buyback cadence and partnership approvals — through a DAO structure operated on the Bubix governance framework.

Super Nodes

Validator election and network governance follow the proven super-node model deployed across Bubix-built networks, with enterprise-grade multi-party consensus.

Compliance-Native

Native KYC/KYB, privacy computing and controllable data sharing are built in — not bolted on — aligning SILIKA with MiCA, GENIUS, CLARITY, UAE VA and ADGM frameworks.

Queensland Regulatory Footing

The underlying asset operates on granted mining leases under Queensland tenure, verifiable through public government records — EPSL00627313.

COMPLIANCE HORIZON

MiCA RegulationGENIUS ActCLARITY ActStablecoin OrdinancesUAE VA FrameworkADGM Digital Asset Framework

12 — INTEGRATED ROADMAP

Mine execution and token milestones on one timeline

PHASE 01

Foundation & De-Risking

Assay-led validation & structure

  • Channel sampling, whole-rock geochemistry, beneficiation testwork
  • Tenure verification via Queensland records (EPSL00627313)
  • SILIKA token architecture finalised on Bubix DTI stack
  • Off-take counterparty qualification samples
  • Initial fundraising (Public & Private Sale)

OUTPUT

Every estimated figure replaced with measured data before material capital commits.

PHASE 02

Plant Build & Token Launch

Phase I mine execution (Years 1–2)

  • Modular crushing, flotation and acid-leaching plant construction
  • Trial-mining feed from alluvial accumulations
  • SILIKA token launch (BEP-20) and DEX/CEX liquidity
  • Geological Oracle (DRTR) live with first quarterly attestation
  • Staged capital deployment matched to production ramp

OUTPUT

Commissioning complete; token liquidity established; on-chain reserve data live.

PHASE 03

Ramp to Full Off-Take

Phase II execution (Years 3–10)

  • Open-pit extraction across ML 20354, ML 20357, ML 20360
  • Ramp to 500,000 tpa — full off-take delivery
  • Proof of Production (IoT · GPS · satellite) on every tonne
  • Supply Chain NFT Passport on every container via Port of Cairns
  • Thermal chlorination line for Ultra-HPQ 99.99%+

OUTPUT

US$200M–US$357.5M annual revenue band at deck prices; verified on-chain production.

PHASE 04

Value Capture & DeFi Activation

Token economy at full production

  • Buyback & burn and revenue sharing from operating cash flow
  • Staking tiers and Reserve-Backed Lending live
  • CL-NFT reserve instruments issued to qualified holders
  • Carbon credit integration across production
  • DAO governance activation — super nodes elected

OUTPUT

Token value mechanically linked to production performance.

PHASE 05

Sustained Supply & Ecosystem Maturity

Phase III (Years 11–20+)

  • Steady 500,000 tpa through reserve life
  • Reserve extension and throughput upside drilling
  • Multi-asset RWA expansion on the SILIKA trust layer
  • Global distribution to North Asian semiconductor & solar supply chains
  • Treasury optimization & long-term sustainability

OUTPUT

A mature, self-sustaining RWA ecosystem anchored to two decades of verified supply.

13 — OWNERSHIP & PARTNERS

Asset, token and infrastructure under one aligned structure

ASSET OWNER

Nordev Quartz Silica Pty Ltd

Mareeba High-Purity Quartz Project — 7 granted mining leases, Far North Queensland

Greg Rains — Owner

Walter Kaminski — Owner

TRUST INFRASTRUCTURE

Bubix Group

Digital Trust & Intelligence Infrastructure — build & joint operation of the SILIKA on-chain stack

14 — RISK MANAGEMENT & ESG

Every risk paired with a structural mitigation

RISKIMPACTMITIGATION
Estimate risk (non-JORC)Reserve figures are company estimates at pre-feasibility stageAssay-led de-risking — measured data before material capital
Price fluctuationMargin reductionProduct diversification across the purity ladder; long-term off-take
Execution / technicalProduction disruptionModular plant design; staged capital matched to ramp milestones
Market demand variabilityRevenue instabilityLong-term contracts; premium product focus; diversified end-markets
Regulatory & token regimeCompliance burden across jurisdictionsCompliance-native stack (KYC/KYB, privacy computing); Queensland tenure
EnvironmentalESG exposure of extractive operationsOn-chain carbon measurement, verified offsets, audited disclosure
High-purity quartz crystal

Not merely an investment in quartz —

in the infrastructure powering the future

15 — CONCLUSION

Three forms of proof, continuously validating each other

SILIKA converges a granted, verifiable Queensland mining tenure; a secured 500,000 tpa off-take spanning two decades; and a compliance-native trust stack built by the operators of national blockchain infrastructure. Each layer continuously validates the others — from geological attestation to production events to token distribution.

  • 11.2 Mt estimated total reserve — ~20 years of mine life at full off-take
  • 500,000 tpa secured off-take — revenue visibility from commissioning
  • US$200M+ annual revenue potential — base case 100% HPQ at US$400/t FOB
  • ~61% EBITDA margins — ~US$122M base, ~US$218M premium mix at deck assumptions
  • 7 granted mining leases — 60–90 minutes from the Port of Cairns
  • Compliance-native trust stack — Bubix Group, 140+ core patents, nation-scale track record
  • A non-US source of high-purity quartz for Asian tech supply chains
  • Silicon on Australia's Critical Minerals List — strategic government support pathway

INVESTOR PRESENTATION

Mareeba High-Purity Quartz Project

Full investor presentation including geological overview, financial framework, tokenomics, trust layer architecture and roadmap. September 2026 · V2.0

Download PDF — 2.5 MB

DATA ROOM ACCESS

Request full due diligence materials

Qualified investors may request access to the full data room — geological reports, tenure documents, off-take term sheet, and Bubix technical architecture.

Request Data Room Access

CONTACT

Investor Enquiries

[email protected]

SILIKA

Silica Mining Resources

Tokenized by Nordev Quartz Silica Pty Ltd

On-chain infrastructure by Bubix Group

Forward-looking statements involve known and unknown risks and uncertainties; actual results may differ materially. Reserve figures are company estimates and are not JORC-compliant Mineral Reserves. The revenue and EBITDA framework is illustrative only and is not a valuation opinion, a forecast, or a representation of future performance. Market data are drawn from published third-party sources and have not been independently verified. Nothing herein constitutes investment, legal, or tax advice.

© 2026 SILIKA — Silica Mining Resources